Home  >  Application  >  Applicaiton

40PV-ZP Vertical Sump Slurry Sewage Pump with 1800mm Extension Shaft

Apr. 07, 2021

Project Description:

Mine tailings drainage, the depth of the pit is 2 meters, the diving depth of the pump is required to be no less than 1.8 meters. Breaking the conventional extension pipe design, the pump shaft is required to be 1.8 meters long, stable operation, reliable performance, durable, anti-wear, and a complete set of motors.

Pump selection: 40PV-ZP vertical sump slurry pump

Pump capacity: 25m3/h

Pump head: 15m

Submerged length: 1800mm

Pump ready photos in Zidong workshop:

40PV-ZP Vertical Sump Slurry Sewage Pump with 1800mm Extension Shaft

 

Hot Products

Request a Quote